<link rel="stylesheet" href="styles.496d4e7d62ff4fd0.css">
Repository logo
KNOWLEDGEREPOSITORY

Publication:
Final Report on the Preparatory Phase of the Project on Trypanosomiasis Control in the Kagera Basin

au.identifier.referenceRAF/87/132
dc.contributor.authorAfrican Union Inter-African Bureau for Animal Resources (AU-IBAR)
dc.date.accessioned2021-02-20T23:41:47Z
dc.date.available2021-02-20T23:41:47Z
dc.date.issued1990-01-30
dc.descriptionIn collaboration with the Kagera Basin Organization and in association with the Food and Agriculture Organization of the United Nations.
dc.description.abstractThe Kagera River Basin area comprising parts of Burundi, Rwanda, Tanzania and Uganda is a region with great potentials for agricultural and livestock development. Tsetse and Trypanosomiasis have been the major constraints to realising the full potential of these resources. During the preparatory phase of the United Nations Development Programme (UNDP) funded-Trypanosomiasis control in the Kagera Basin and executed by the Economic Commission for Africa (ECA) with technical input from the International Centre of Insect Physiology and Ecology (ICIPE); information was gathered on the extent of tsetse and trypanosomiasis problem in the basin. The status of the problem was validated through surveys carried by the national teams (of the respective member states) dealing with tsetse control in the basin area. A map of the current tsetse and trypanosomiasis situation was produced.
dc.description.sponsorshipUnited Nations Development Programme (UNDP)
dc.identifier.urihttps://repository.au-ibar.org/handle/123456789/244
dc.language.isoen
dc.subject.auibarAnimal Health::Endemic and Production Diseases::Trypanosomosis and Tsetse Control
dc.titleFinal Report on the Preparatory Phase of the Project on Trypanosomiasis Control in the Kagera Basin
dc.typeCloseout or completion report
dspace.entity.typePublication
dspace.relatedentity.typeOrgUnit
relation.isAuthorOfPublication63d748bd-a417-4b0f-9842-be15fbfb2361
relation.isAuthorOfPublication.latestForDiscovery63d748bd-a417-4b0f-9842-be15fbfb2361
relation.isFunderOfPublication9515eaf7-d0a6-4710-bf60-d42dbe5b73ce
relation.isFunderOfPublication.latestForDiscovery9515eaf7-d0a6-4710-bf60-d42dbe5b73ce

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
PREPARATORY PHASE OF THE PROJECT ON TRYPANOSOMIASIS CONTROL IN THE KAGERA BASIN (RAF-87-132).pdf
Size:
1.12 MB
Format:
Adobe Portable Document Format